Skip to content

Controls for your tracker mechanics

Many tracker manufacturers design the steel structure and drive themselves, but not the controls. The large vendors only supply their controls together with their own trackers. Feldmelder is an independent controller with a portal, meant to fit your mechanics.

What a tracker controller has to do

  • Sun position and backtracking for the row spacing of your plants
  • Safety positions for wind, severe-weather warnings and snow – without internet, too
  • Two drives per tracker in sync, limit switches, emergency stop
  • Messages and data for operators and service

What Feldmelder does here

  • The box computes the sun position and points the trackers; with backtracking it flattens the rows when the sun is low so that no row shades the next.
  • The box works without the cloud – it decides on safety positions in the field and buffers its data for up to 72 hours.
  • Wind stow from the wind sensor in the field; while it is active the box refuses the "automatic" command.
  • On an official hail or storm warning of the German Weather Service (DWD) for the site the box moves the trackers to the safety position (off until it is set up).
  • On a DWD snow or ice warning the trackers move to the snow position so that the snow slides off.
  • If the link to a tracker drops, it follows its stored schedule and then moves to the safe position.
  • A fault at one tracker reaches the portal with the tracker number; the other rows keep following the sun.
  • Commands from the portal (safety position, automatic, maintenance) are signed and valid for two minutes only; the box rejects forged commands.
  • The protocol between box and portal (TTP v1) is openly documented, with JSON schemas to validate every message.

How working together would start

We start with your documents: geometry, drives, sensors, power supply. From these we plan a pilot on one of your trackers – with acceptance criteria we agree on beforehand. Series and quantities come only after that.

Scope

  • No certification to standards for tracker controls (e.g. IEC 62817) – that would be part of a series project.
  • No ready connection to other controllers, radio protocols or drives; your hardware is connected in the pilot.

How we work: every function of the box, the tracker control unit (TCU) and the portal is covered by automated tests. Field installations start with a pilot project and acceptance criteria agreed beforehand. The live demo shows an example plant with example data.